The number the model already had — 30 s short (EN)

0:00 · English · Acquisitions

Watch this video

Enter your details to access the library. We'll email you a code to verify your address.

See how we use your data in our Privacy Policy.

About this video

Thirty seconds for data-centre deal teams: Ellie checks the seller's numbers against their own documents, flags the power-cost recovery that doesn't hold, and prices it — over a hundred million off the guide price, before the bid.

Full description

For data-centre deal teams: Ellie checks the seller's numbers against their documents. She reads the memorandum, power contracts and tenancy schedule, and rebuilds every model input. She flags what doesn't hold: the power-cost recovery the model assumed, against the contracts. And she prices it: over a hundred million off the guide price, before the bid. Watch the full demo today. Vertical (1080x1920) cut: https://drive.google.com/file/d/1IKGT4F-F6j6I7mpr9RTZjCYT6LuwUaAb/view . Full demo: https://videos.fifthdimensionai.com/watch/the-number-the-model-already-had-en

Key points

  • Reads the memorandum, power contracts and tenancy schedule and rebuilds every model input, cited
  • Flags the power-cost recovery the model assumed (100%) against what the contracts allow (73.5%)
  • Guide price S$620.0m to a verified S$515.2m — over a hundred million off, before the bid
Transcript

for data center deal teams. Ellie checks the seller's numbers against their documents. She reads the memorandum, power contracts, and tenancy schedule and rebuilds every model input. She flags what doesn't hold, the power cost recovery the model assumed against the contracts, and she prices it over a hundred million off the guide price before the bid. Watch the full demo today.

Fifth Dimension for deal teams

From data room to cited IC memo

Video details
Roles
Portfolio Manager, Investor / LP
Processes
Acquisitions
Geographies
APAC
Markets
Singapore
Tags
sembrook-dc-model-tieout, short, 30s, data-centre, anaplan