About this video
Thirty seconds for data-centre deal teams: Ellie checks the seller's numbers against their own documents, flags the power-cost recovery that doesn't hold, and prices it — over a hundred million off the guide price, before the bid.
Full description
For data-centre deal teams: Ellie checks the seller's numbers against their documents. She reads the memorandum, power contracts and tenancy schedule, and rebuilds every model input. She flags what doesn't hold: the power-cost recovery the model assumed, against the contracts. And she prices it: over a hundred million off the guide price, before the bid. Watch the full demo today. Vertical (1080x1920) cut: https://drive.google.com/file/d/1IKGT4F-F6j6I7mpr9RTZjCYT6LuwUaAb/view . Full demo: https://videos.fifthdimensionai.com/watch/the-number-the-model-already-had-en
Key points
- Reads the memorandum, power contracts and tenancy schedule and rebuilds every model input, cited
- Flags the power-cost recovery the model assumed (100%) against what the contracts allow (73.5%)
- Guide price S$620.0m to a verified S$515.2m — over a hundred million off, before the bid
Transcript
for data center deal teams. Ellie checks the seller's numbers against their documents. She reads the memorandum, power contracts, and tenancy schedule and rebuilds every model input. She flags what doesn't hold, the power cost recovery the model assumed against the contracts, and she prices it over a hundred million off the guide price before the bid. Watch the full demo today.
From data room to cited IC memo
Video details
- Roles
- Portfolio Manager, Investor / LP
- Processes
- Acquisitions
- Geographies
- APAC
- Markets
- Singapore
- Tags
- sembrook-dc-model-tieout, short, 30s, data-centre, anaplan