About this video
Thirty seconds for data-centre deal teams: Ellie checks the seller's numbers against their own documents, flags the power-cost recovery that doesn't hold, and prices it — over a hundred million off the guide price, before the bid.
Full description
For data-centre deal teams: Ellie checks the seller's numbers against their documents. She reads the memorandum, power contracts and tenancy schedule, and rebuilds every model input. She flags what doesn't hold: the power-cost recovery the model assumed, against the contracts. And she prices it: over a hundred million off the guide price, before the bid. Watch the full demo today. Vertical (1080x1920) cut: https://drive.google.com/file/d/1IKGT4F-F6j6I7mpr9RTZjCYT6LuwUaAb/view . Full demo: https://videos.fifthdimensionai.com/watch/the-number-the-model-already-had-en
Key points
- Reads the memorandum, power contracts and tenancy schedule and rebuilds every model input, cited
- Flags the power-cost recovery the model assumed (100%) against what the contracts allow (73.5%)
- Guide price S$620.0m to a verified S$515.2m — over a hundred million off, before the bid
Video details
- Roles
- Portfolio Manager, Investor / LP
- Processes
- Acquisitions
- Geographies
- APAC
- Markets
- Singapore
- Tags
- sembrook-dc-model-tieout, short, 30s, data-centre, anaplan