Will the loan really extend? (EN)

3:25 · English · Loan Abstraction

Watch this video

Enter your details to access the library. We'll email you a code to verify your address.

See how we use your data in our Privacy Policy.

About this video

Ellie tests a loan extension against the amended debt-yield covenant and works out the cure before the committee decides.

Full description

Pinecrest's loan matures, and the plan is to extend. Ellie reads the loan agreement and its First Amendment: the extension test moved from 7.75% to 8.50% debt yield, so the property's 7.95% fails by 55 bp. She derives the cure prepayment of $12,305,882 from the documents, with the 0.25% fee shown separately, and compares extending with the two refinancing offers.

Key points

  • Amendment changes the extension test
  • Cure prepayment derived from the loan documents
  • Extend versus refinance on one basis
Transcript

Pinecrest is a debt management demo. Nine medical office buildings across the Midwest financed by one loan of $190 million that matures in March. On Thursday, the debt committee decides whether to extend it or refinance, and every cell here opens the document behind it. The data room holds the loan agreement and its amendment, the lender's package, two term sheets, and the fund's debt schedule. Capital Markets asks Ellie to check the extension test the lender will actually apply.

The fund's debt schedule shows a pass. The first finding contradicts the debt schedule. Click it and the amendment opens on the clause. Last October, the first extension test was raised from 7 and 3/4 to 8 1/2%. The lender's own package puts the debt yield at 7.95%, 55 basis points short. On the executed documents, the extension is not available today and the loan is due on the 15th of March, 2027. There is a way back in. The agreement allows a cure prepayment at par with no premium.

Ellie shows the arithmetic. Three roots sized to the dollar off the same income. The schedule lands as a workbook with live formulas. The critical dates. The notice window runs from the 15th of November to the 14th of January. The extension test runs live. A 12.3 million cure lifts it to the test. and the options new loans of 157.2 or 170.3 million in the brief. Click a figure and its source opens beside it. Extending costs less now but faces a harder test.

Refinancing on the larger term sheet needs 19.7 million of new equity. The committee paper is drafted on the house template. The decision requested, the finding and the clause and page behind every term. Then the test becomes a skill scheduled as an agent on the workspace for the first of every month. Ellie rereads the loan and every amendment and retests the extension against the latest lender reporting package. It flags any drift in the debt schedule and saves a dated note.

This is the finding a general model would miss. The debt schedule and the adviser's memo both test against the old threshold because nobody logged the amendment. Ellie follows the amendment into the agreement and finds the fallback is not free before Thursday, not in March. One loan file in, one committee ready decision out.

Fifth Dimension for asset managers

Asset performance, always current

Video details
Roles
Owner, Lender, Asset Manager
Processes
Loan Abstraction, Asset Management
Geographies
US
Markets
United States
Tags
author-demo-2, loan extension, debt yield, refinancing