Are your energy figures ready for the lender? (EN)

3:32 · English · Risk & Compliance

Watch this video

Enter your details to access the library. We'll email you a code to verify your address.

See how we use your data in our Privacy Policy.

About this video

Ellie rebuilds a building's energy-use figure from meter photos and approved plans before it goes to the lender.

Full description

Tessera Quay in Singapore reports energy intensity to its lender. Ellie finds the February and March bills were estimated (meter photos add 540,000 kWh) and the brochure floor area includes a 12,400 m² car park that the approved plans exclude. Together they take energy use to 155.95 against a limit of 150, a KPI fail and a 10 bp margin swing worth about S$1.1m a year.

Key points

  • Estimated bills caught against meter photos
  • Floor area checked against the approved plans
  • KPI result and margin impact quantified
Transcript

Tessera Quay is an office tower in Marina Bay, Singapore, financed with a 1.1 billion Singapore dollar sustainability linked loan. By the 9th of October, the owner must certify the building's energy use to the lender. The data room holds the agents register which says the tower passed and the evidence 12 bills and the approved plans and month-end photographs of the plant room meters. The asset team asked Ellie to rebuild the register from that evidence and test it against the loan.

The first problem is in the bills. February and March were never read, so both were build on estimates. Click the reference and the bill opens on the supplier's own note. The meters could not be reached, but the chiller contractor photographed both meters at month end. Click a reading and the photograph opens. Ellie reads the display and checks the serial number against the bill. On the actual readings, the tower used 540,000 kilowatt hours more than build.

The second problem is the floor area. The loan agreement requires the approved plans and forbids any marketing figure. The approved plans give 150,300 m. The register divides by 162,700 taken from a leasing brochure. The 12,400 gap is the excluded basement car park. The corrected register is a workbook with live formulas. Month by month, each bill against its meter photograph. The floor area rebuilt sheet by sheet from the approved plans and the loan test 155.95 kilowatt hours a square meter against a limit of 150.

The dashboard shows the test not met. The agents register said 140.75. Month by month, the two estimated bills stand out at once. On the loan tab, the margin rises five basis points, not falls. Fully drawn, that is 1.1 million Singapore dollars a year. Ellie then drafts the cover note on the house template. It goes to the lender and certifies the test as not met. This is what a general model is likely to miss. Under the loan, actual readings must be used wherever a dated photograph exists.

The register took its floor area from a leasing brochure. The loan forbids that floor area must come from the approved plans. The brochure figure is the approved area plus the car park. Applied together, the floor area alone turns a pass into a fail. 12 bills, a year of meter photographs, and the approved plans in one number. The loan is priced on checked before anyone signs it.

Fifth Dimension for asset managers

Asset performance, always current

Video details
Roles
Asset Manager, Lender, Compliance / Risk
Processes
Risk & Compliance, Asset Management
Geographies
APAC
Markets
Singapore
Tags
author-demo-2, energy, sustainability-linked loan, Singapore